Recommended semester: 1st - 4th semester |
Scope and form: Full time exercise during the 3 week period. |
Evaluation: Approval of exercises and reports
|
Examination: Pass/fail |
Previous course: 80173 / 83173 |
Prerequisites: 42301(80001). 42302(80002) / 42305(80005) / 42309(80009). |
No credit points with: 80173 / 83173 |
Participant limitation: Max. 40 |
Aim: With basis in given engineering design drawings and production machinery to enable the students to: - define alternative manufacturing processes. - evaluate these alternatives on the basis of e.g. time and material use, and costs of tools and machinery. - detailed planning of selected manufacturing system including part operations, determination of operation data and select / design tools etc. - to evaluate the selected system through work-shop exercises. |
Contents: Possible topics are: Formulation of the methods planning problem when drawings and production equipment are given. Planning of alternative manufacturing systems by decomposing into processes / operations in order to: Evaluate these alternatives on the basis of e.g. time and material use and costs of tools and machinery, make a detailed planning of the selected progress by decomposing into partial operations, determinate operation data, select / design tools etc., estimate set-up and operation time and determine material and tool costs, and finally prove the validity of selected systems through practical exercises. |
Contact: Bjarne Hans Clausen, building 424, (+45) 4525 4825, bhc@ipl.dtu.dk Peter Jacobsen, building 424, (+45) 4525 4815, pj@ipl.dtu.dk |
Department: 042 Department of Manufacturing Engineering and Management |
Keywords: Process planning, time estimation, cost estimation, exercises in workshop, visit to a factory |
Updated: 20-02-2001 |