| 42959 Production Control |
| Danish title: Produktionsstyring |
|
Language: Danish ECTS-creditpoints: 5, External examination.
|
|
|
Exam schedule:
|
E4-B (dec 19 2001) |
| Recommended semester: 4th semester |
| Evaluation: Written exam
|
| Examination: 13-scale |
| Previous course: 94510 |
| Compulsory: 94920 |
| Prerequisites: Production Control |
| No credit points with: 94511 |
Aim: For a specific (relatively simple and well-defined) production situation to enable the students: - To carry out materials and capacity planning and draw up realizable production plans based on given decisions rules and by use of models / methods / techniques presented in the course, - To evaluate the consequences and the applicability of the selected models / methods / techniques. |
| Contents: The production firm as a controlled system - types of productions - the production control system (function, structure and interactions with the production system and other control systems) - decision variables in material and capacity planning, e.g. deteministic and stochastic inventory models, material requirements planning (MRP), Gantt-charts, network analysis (PERT), Just in time (JIT) and Optimized Production Technology (OPT) |
| Contact: Annelise Rasmussen, building 358, (+45) 4525 5636, annelise@ipl.dtu.dk |
| Department: 042 Department of Manufacturing Engineering and Management |
| Keywords: Production control, Inventory control, MRP, Network |
| Updated: 12-07-2001 |
|
|