| Previous course: 59151/C5951 |
| Offered by:
Department of Structural Engineering and Materials
(BKM) |
| No credit points with: 59151/C5951 |
| Prerequisite: 59107 (tages senest samtidig) |
| Recommended semester:
3rd semester |
| Examination:
Evaluation of report
(
pass/fail
) |
| Remarks: The course is held in the 14-week period and may be taken as an option concurrently with 59107. |
| Contact person: |
Claus Philipsen, BKM, Building 118, Tel. +45 4525 1757 |
|
| Aim: Enable the participants to apply the curriculum from course 59107 to practical purposes of calculation and to estimate the physical assumptions necessary for the calculations. |
| Contents: The topic in the course is the design of a pedestrain bridge crossing a motorway. In addition to the topics from course 59107, the official norms on loading and safety are used in the design. The second part of the period is a laboratory course where among other things the physical assumptions made in course 59107 are investigated. Experiments are carried out with models of selected beam and frame structures. |